Posted on Leave a comment

Translink Newtownabbey

Project supplied & fitted this week for Cleary Contracting in Translink Newtownabbey.

Project supplied & fitted this week for Cleary Contracting in Translink Newtownabbey for a new storage compound. Standard classic mesh fencing & vehicle/ pedestrian gates fitted to existing concrete. Once again high quality materials & workmanship provided.

Posted on Leave a comment

Glack GAC

Great spell of weather to finish off this project on behalf of Glack GAC Co Derry.

A Fantastic transformation with the new fencing & concrete walking path. The fence system supplied & installed here is 1.2m high spectator fencing with Hot Dip Galvanised steel which has a lot longer life expectancy than other steel products available so they club will have a high quality fence for many years to come.

Posted on

Rock St. Patrick’s GAC

A small project fitted recently by Rogers Fencing Supplies Ltd at Rock St. Patrick’s GAC just outside Cookstown.

This 1.2m high 868 spectator fencing & pedestrian gates is fully hot dip galvanised & powder coated. Here we neatly core drilled the existing concrete path to leave a tidy finish with no disturbance.

Posted on 1 Comment

Hilltop Fuels

2.4m high boundary fencing & gates installed recently in Cookstown at Hilltop Fuels.

2.4m high boundary fencing & gates installed recently in Cookstown at Hilltop Fuels where the client had to restrict access into an adjoining property. A set of 6m swing gates also installed for vehicular access. All materials with a Black Powder Coated finish. Phase 2 works coming soon at the same property.